I have a potencial Fiber Cabling job they have 3 locations that need fiber .they are one after another .What would be the best way to do this
I was thinking I could run a 6 strand to the first location then terminate that and use 2 strand there then another 6 strand to the next location and connect the 4 remaining strands from the first location terminate 2 strands ther then run another section to the next section for the last 2 strands

Its just one long run with 3 separate locations

or would there be any reason to make them all home runs all home runs

any thoughts would be greatly apperciated

Thanks

Tel-Data1