|
|
Joined: Jan 2007
Posts: 1,014
Member
|
OP
Member
Joined: Jan 2007
Posts: 1,014 |
Greetings, I'm not sure why but lately I've come across a lot of systems installed above drop ceilings. It's obvious they were installed after the ceiling was installed some as high as 12 feet. What I'm looking for are any national codes prohibiting the practice. So far the only one I can find from NEC is that no flexible cords may be plugged into an outlet above a drop ceiling that is 400.7 I believe. I also thought there was a code about equipment being installed at a workable height and clearance? These clients think I'm nuts when I tell them before I work on it I have to move it. The general response is whatsa matter ain't you got a ladder? Thanks
John 807
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
Forums84
Topics94,287
Posts638,784
Members49,767
|
Most Online5,661 May 23rd, 2018
|
|
|
|
|