|
Joined: Mar 2002
Posts: 411
Member
|
OP
Member
Joined: Mar 2002
Posts: 411 |
I've got a customer with a Qwest Integrated T1 that needs to move soon. If I were to order a point to point T1 from their old location to their new location, should I expect it to work to put a crossover cable between the live circuit and the PtP and plug the router into the other end of the PtP? It seems like it should but I wanted to sanity check it.
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Dec 2005
Posts: 2,928
Member
|
Member
Joined: Dec 2005
Posts: 2,928 |
why not just have quest move the T1 to the new location?
I Swear I did not touch anything
|
|
|
|
Joined: Mar 2002
Posts: 411
Member
|
OP
Member
Joined: Mar 2002
Posts: 411 |
It's about 45 days or more for the move but they are moving in 10 days.
|
|
|
|
Joined: Aug 2003
Posts: 5,154 Likes: 2
Moderator-Vertical, Vodavi
|
Moderator-Vertical, Vodavi
Joined: Aug 2003
Posts: 5,154 Likes: 2 |
I would not think that would work but, I've never tried it. Hopefully, JustBill will stop by and see your question. I'm confident he'll have an answer. BUT, even if it were to work, I would not do it. Too much potential for problems. PLUS, you MUST consider 911 issues. What happens if someone calls 911 and the Police show up at the old address? Do you want to have liability? I realize you're just trying to do everything possible to help out the customer, and I applaud that But, the customer should have notified the phone company earlier. Let them work out that issue with the customer. -Larry
|
|
|
|
Joined: May 2002
Posts: 17,722 Likes: 18
Member
|
Member
Joined: May 2002
Posts: 17,722 Likes: 18 |
I too have never tied two T1's together to basically extend the existing T1. You'd be putting the output of one conditioned circuit to the output of another conditioned circuit. I honestly don't know if it would work or not, I don't think I'd try it, although in theory it wouldn't be much different than passing it from CO to CO. I've never heard of tying two NID's together, my main question would be, even if it worked, if you had errors which T1 would you report? Maybe someone can give you a more definite answer.
If they can put in a new T1 in time they surely can move the existing in time.
Retired phone dude
|
|
|
|
Joined: Mar 2002
Posts: 411
Member
|
OP
Member
Joined: Mar 2002
Posts: 411 |
I stopped in and spoke with one of the central office techs and he seemed to think it would work fine. Both locations are served from the same CO. They don't do hot cuts of this type of circuit, it's an entirely new circuit. The Integrated people get an Internet port that's hooked to a DS1 from the regulated people. That many ducks can't be lined up in less than a month I guess... I can get the new circuits as a CLEC in a regulated amount of time :-)
|
|
|
|
Joined: Jun 2007
Posts: 83
Member
|
Member
Joined: Jun 2007
Posts: 83 |
Great site. I have been lurking for the past couple months and have finally decided to register. To answer your question yes you can do it the way you described but, you must make sure that the LBO in the NIU's at the site where you are going to do the patch is set to 0. If not you will take errors. Now, like others here, I would not do it that way but,since you are on a timeline it should work fine for a temp. solution.
|
|
|
|
Joined: May 2002
Posts: 17,722 Likes: 18
Member
|
Member
Joined: May 2002
Posts: 17,722 Likes: 18 |
The LBO's to zero is a very good point, if you are on fiber it will already be zero if on copper it will probably be set to -8. Now another problem arises, you get in the NIU to change the line build out and once again you're in trouble. If it belongs to the LEC, I or CLEC, best rule of thumb is don't touch it. By the way welcome to the board whynot, you are now officially hooked.
Retired phone dude
|
|
|
|
Joined: Dec 2006
Posts: 1,516
Member
|
Member
Joined: Dec 2006
Posts: 1,516 |
Will a separate customer be occupying the old location? Even though patching the current circuit to a PTP may work, it's best to have the customer address this directly with their provider. I doubt that they will approve it, but if they do (and it's provided via copper), they may require a designated rack & small patch panel be installed at the old location's demarc. aboard, whynot!!
|
|
|
|
Joined: May 2002
Posts: 17,722 Likes: 18
Member
|
Member
Joined: May 2002
Posts: 17,722 Likes: 18 |
One thing throwing me on your post. You say you can get them to throw in a new T1 from old to new location, but not get the old moved in time. All that's being moved is the "last mile", same CO per your post. So unless the T1 is from a "long haul" carrier there should be no difference in new and last mile. If it's from a "long haul" then yes they will order a whole new circuit. Just have my curiosity on that part of your post.
Retired phone dude
|
|
|
Forums84
Topics94,284
Posts638,772
Members49,765
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
106
guests, and
294
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|