I have a project coming up that will require a 50 pair PE89 from point A to point B. Also another 50 pair PE89 from point A to point C.
Should I put two 50 BET's at point A, or one 100 pair BET?
Thanks. Jim
|
|
|
|
Joined: Jan 2005
Posts: 15,351 Likes: 12
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,351 Likes: 12 |
I'd do a single 100 pair one to save space and keep everything bonded together in the best way.