You guys have worked around it. Siemon makes an S110 or S210 product that terminates 100,200,300 pairs in a rack mount strip. S110-db1 is one of the Cat-5e parts for 100 pairs in a 1U arrangement.

Carl

Atcom VoIP Phones
VoIP Demo

Best VoIP Phones Canada


Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.

Joined: Jan 2018
Posts: 218
Member
Offline
Member
Joined: Jan 2018
Posts: 218
Hal how about a picture of Hillary Clinton , no one would touch that .


Ground is Ground the world around !
Joined: Feb 2005
Posts: 12,344
Likes: 3
Member
***
Offline
Member
***
Joined: Feb 2005
Posts: 12,344
Likes: 3
Except an IT guy.

-Hal


CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
Joined: Jan 2018
Posts: 218
Member
Offline
Member
Joined: Jan 2018
Posts: 218
That is funny Hal my friend an I got a good laugh . He has also dealt with these pimple faced IT people .


Ground is Ground the world around !
Joined: Feb 2009
Posts: 664
hawk82 Offline OP
Member
OP Offline
Member
Joined: Feb 2009
Posts: 664
Originally Posted by EV607797
Siemon makes rack-mounted S110 and S210 series blocks, which are rated for CAT5e use. I'm not sure if they have a CAT6 version, but it would be the easy solution to this dilemma. Punch down the station cables on one side and the outgoing cables to the other rack would punch down on the other side of the blocks. Place this panel at the top of the existing rack, or on a wall-mount bracket. Place an industry-standard cover on it and *poof*, nobody would mess with them, in theory of course.

TAKE A LOOK HERE
Sorry for the late response. This Siemon solution looks like as good as it will get. The S210 on their website says it "exceeds category 6 specifications". So that should cover the CAT6 wiring and S110 would cover the CAT5e wiring. I'll be honest that I think I've only seen a handful of 110 blocks used in my travels. All of them were for phone wiring. I'm much more comfortable with 66 blocks, but obviously those wouldn't work in this situation.

To clarify for everyone, the 1st floor is a copier room with limited space. It originally was the IT closet until things were moved out. My friend and colleague is the "pimply IT weenie" who asked me to bid on the job. I can understand why he'd rather have all network equipment in a locked 2nd floor dedicated room/closet for IT where there is going to be one big UPS installed soon (just needs batteries and 30A circuit installed). The client is a non-profit, lots of people coming and going. They do have a licensed electrician that helps out time to time, and he can run any wiring that absolutely has to be replaced in the finished walls. Some of the existing runs have some "creative" connections when I took a brief look above the small drop ceiling (end connectors to couplers) in one area of the office. They use VoIP phones and many of them won't work on PoE, only link up at 100Mbit, etc due to various wiring issues.

Joined: Jan 2007
Posts: 153
Member
Offline
Member
Joined: Jan 2007
Posts: 153
We have a large customer that has probably 40 IDFs of which data cabling has been extended from 110 blocks to patch panels on relay racks. Some closets use cat5e 25 pair cabling with amphenol connections to patch panels that have amphenol connections and some have just 4 pair cabling for each connection. It's cat5e and they use POE no problem. No problems having drops certify with my Fluke DSX either. Certainly any hacked in cabling from sparky could cause an issue at your site.....

Last edited by Kevin-MI; 03/25/18 03:33 PM.

Technician I IBEW Local #58 Detroit, MI
Joined: Mar 2018
Posts: 345
Likes: 1
Member
Offline
Member
Joined: Mar 2018
Posts: 345
Likes: 1
Before touching anything I would make them get a list of existing problem locations to you so you aren't chasing your tail trying to fix problems that were already there.


The Cloud is just someone else's computer!
Joined: Feb 2009
Posts: 664
hawk82 Offline OP
Member
OP Offline
Member
Joined: Feb 2009
Posts: 664
Update:

I got the cabling done for the annex building which had fewer cabling issues than I suspect will be at the main building. Main building will be done at another point. I looked high and low for Siemons branded 110 Blocks, but Graybar was sold out, and two local electrical suppliers don't carry it. Amazon doesn't have it either. My colleague ended up getting Panduit branded 110 blocks and they worked out good. Here's a photo of my work.

[Linked Image from i.imgur.com]

Left hand side of the block are the new cables coming from the new rack in the basement/1st floor. Right hand side are the existing runs to jacks on the 2nd floor/main floor. Most of those cables had no slack and some were CAT6, so I did the best I could with leaving a small loop at the bottom. I hate mixing category wires but that is what was dealt to me. Plugged in all of the PoE phones, PoE accesspoints, and a copier and everything came up. The brown wire is a thermostat wire or something else. I left it alone as it wasn't something I needed to touch. Thanks for the advice all.

Joined: Feb 2005
Posts: 12,344
Likes: 3
Member
***
Offline
Member
***
Joined: Feb 2005
Posts: 12,344
Likes: 3
Nice job!

-Hal


CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
Joined: Dec 2002
Posts: 9,423
Likes: 1
Member
*****
Offline
Member
*****
Joined: Dec 2002
Posts: 9,423
Likes: 1
Very nice!


Jeff Moss

Moss Communications
Computer Repair-Networking-Cabling
MBSWWYPBX, JGAE
Page 2 of 3 1 2 3

Moderated by  Silversam 

Link Copied to Clipboard
Forum Statistics
Forums84
Topics94,287
Posts638,784
Members49,767
Most Online5,661
May 23rd, 2018
Popular Topics(Views)
211,811 Shoretel
188,967 CTX100 install
187,204 1a2 system
Newest Members
A2A Networks, James D., Nadisale, andreww, gohunt
49,766 Registered Users
Top Posters(30 Days)
Toner 22
teleco 5
dexman 4
dans 3
Who's Online Now
0 members (), 147 guests, and 227 robots.
Key: Admin, Global Mod, Mod
Contact Us | Sponsored by Atcom: One of the best VoIP Phone Canada Suppliers for your business telephone system!| Terms of Service

Sundance Communications is not affiliated with any of the above manufacturers. Sundance Phone System Forums - VOIP & Cloud Phone Help
©Copyright Sundance Communications 1998-2024
Powered by UBB.threads™ PHP Forum Software 7.7.5