| Joined: Jan 2005 Posts: 15,312 Likes: 7 Moderator-Vertical, Vodavi, 1A2, Outside Wire | OP Moderator-Vertical, Vodavi, 1A2, Outside Wire Joined: Jan 2005 Posts: 15,312 Likes: 7 | My customer needs to have two separate automatic weekly schedules for a tenant (remote office). I've created automatic weekly tables 1 and 2 in the system with the proper time ranges for the week. The tenant's trunks are in group 2, and also in trunk group 2 in the TVS. I've put all of the extensions associated with this separate schedule into extension group 2, and they are also tenant 2. I put day/night buttons on two of them, referencing weekly schedule 2. Have I missed anything?
Ed Vaughn, MBSWWYPBX | | | | Joined: Jan 2005 Posts: 15,312 Likes: 7 Moderator-Vertical, Vodavi, 1A2, Outside Wire | OP Moderator-Vertical, Vodavi, 1A2, Outside Wire Joined: Jan 2005 Posts: 15,312 Likes: 7 | I'm bumping this question up because I need to go live with it tomorrow and need to make sure I'm on the right path. Thanks.
Ed Vaughn, MBSWWYPBX | | | | Joined: Mar 2018 Posts: 345 Likes: 1 Member | Member Joined: Mar 2018 Posts: 345 Likes: 1 |
The Cloud is just someone else's computer!
| | | Forums84 Topics93,514 Posts635,324 Members49,566 | Most Online5,661 May 23rd, 2018 | | There are no members with birthdays on this day. | | | |