Quote
Originally posted by hbiss:
A 1000 ft run of something as small as 3/4 is a hell of a run! There should be some pull boxes in there some place.

-Hal
Well code says no more then 100' between pull boxes (and no more then 360 degrees of bends) - but we all know that only applies to electrical work. I've had electrical contractors install hundreds and hundreds of feet of continuous conduit for telephone "because the code doesn't cover telephone".

Sam


"Where are we going and why are we in this hand basket?"