I am moving a Data Range Comm System (DRCS) from one site to another. It has 3 racks with 4 shelfs of equipment in each rack. They are all connected via a ribbon cable, then wire wrapped with a 25 pair cble then connected via a amphenol extension port(just a small board to extend the cables). Then it goes to a QCP panel, and x connected out thru another amphenol cable to a MDF terminal block. Then it goes out via a krone block to a 1500 pair cable.

We have to remove the rectifier and battery plant before we can touch the DRCS. Once the Alt power is up, we can then start to dismantle the cabinets and trace and lable all the cables and what not. The problem is we cant do any tracing because everything is very tight and we'd have to cut about 4000 tie straps. (this building and equip is like from the 60 and 70's). Never seen half of this stuff. So basically, we are moving the entire racks from site A to site B. Once at site B we are running the amphenol cables to new 110 blocks, then xconnected to the individual users. The worst part is we are on a time crunch. I need to get this done asap. I am going back out to the site sunday. Is there any other way I could start getting this stuff ready to move without taking the DRCS down?

Atcom VoIP Phones
VoIP Demo

Best VoIP Phones Canada


Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.

Joined: Feb 2006
Posts: 14
Member
OP Offline
Member
Joined: Feb 2006
Posts: 14
Oh one more thing, the customer is very stubborn about their setup. They won't change it or let us design it differently.

Joined: Sep 2005
Posts: 2,049
Member
Offline
Member
Joined: Sep 2005
Posts: 2,049
Not to sound like a smart ass but this sounds like a question you should be asking the person who did the prefield on moving the equipment .


Let It Be , I live in a Yellow Submarine . SCCE
Joined: Feb 2006
Posts: 14
Member
OP Offline
Member
Joined: Feb 2006
Posts: 14
Quote
Originally posted by OBTW:
Not to sound like a smart ass but this sounds like a question you should be asking the person who did the prefield on moving the equipment .
the guy is basically retarded. he couldnt get the whole dte-dce = straight thru concept

Joined: Oct 2005
Posts: 3,124
Member
Offline
Member
Joined: Oct 2005
Posts: 3,124
Good Luck and God Bless

Joined: Dec 2004
Posts: 5,722
KLD Offline
Member
Offline
Member
Joined: Dec 2004
Posts: 5,722
This is a bit different than most moves but it does sound like some of the temp. set-ups we did for Sprint while prepping for digital conversion from step.

No way around cutting the ties, tracing, and tagging. I doubt that it went in that long ago --- we were still stitching back then. What you have is why the telcos were so anal about marking EVERYthing.

Write everything down, take pictures before, and don't forget to ground the racks --- and bond everything in sight.

Good luck, and after this move you will know why there are no atheists moving racks!!!

KLD wink


Ken
---------
Joined: Aug 2003
Posts: 5,154
Likes: 2
Moderator-Vertical, Vodavi
*****
Offline
Moderator-Vertical, Vodavi
*****
Joined: Aug 2003
Posts: 5,154
Likes: 2
I'd love to help but I don't even know what a Data Range Comm System is. :confused:

Joined: Oct 2001
Posts: 6,160
Member
Offline
Member
Joined: Oct 2001
Posts: 6,160
A job like that on a tight time frame with a PIA account? The money would need to be really good to offset that stress factor.

Joined: Mar 2001
Posts: 3,869
Member
****
Offline
Member
****
Joined: Mar 2001
Posts: 3,869
Everything is at premium time. There is no realistic estimate of time that can be made.

Call a house mover and sub the job.


THE Bracha, old blond specialist in Rube Goldberg solutions.
Joined: Feb 2006
Posts: 14
Member
OP Offline
Member
Joined: Feb 2006
Posts: 14
lol. The 25 pair cables are being run as we speak. The only main concern is the xconnects. Basically making sure that the 110 is connected correctly to the osp 1500 pr. its actually coming together. Only as of a meeting yesterday with the big wigs, they moved up the testing completion date up a month, ouch


Moderated by  MooreTel 

Link Copied to Clipboard
Forum Statistics
Forums84
Topics94,316
Posts638,930
Members49,775
Most Online5,661
May 23rd, 2018
Popular Topics(Views)
213,137 Shoretel
190,338 CTX100 install
188,734 1a2 system
Newest Members
Kahm310, PeterG, lyte, 4thright, dcl
49,775 Registered Users
Top Posters(30 Days)
Toner 17
jsaad 4
dans 4
lyte 4
Who's Online Now
1 members (erniejoey), 166 guests, and 46 robots.
Key: Admin, Global Mod, Mod
Contact Us | Sponsored by Atcom: One of the best VoIP Phone Canada Suppliers for your business telephone system!| Terms of Service

Sundance Communications is not affiliated with any of the above manufacturers. Sundance Phone System Forums - VOIP & Cloud Phone Help
©Copyright Sundance Communications 1998-2024
Powered by UBB.threads™ PHP Forum Software 7.7.5