Ajkula66,
The smart jacks are Adtran units and I don't have the model numbers. I think they were HDLU or something like that. The CO is within a mile of the facility and these particular circuits come out of a SLiC 96 on the property.

SST,

Huh...really? You just wrote what I have told Paetec, at least, 500 times. How hard is it to design an extra 1,500' into the span? Evidently, much harder than one would be lead to believe...for Paetec, that is. We used to regularly install T-1 circuits into coal mines. Verizon would bring it to the mine property edge and it was up to us to make it the 1-1/2 miles to the bath house where the telephone equipment was installed. Funny....I NEVER had this kind of trouble with the T-1s we installed. (Over 40). Back then (20 years ago) it was just installing repeaters in the span and, as long as the span was dry, you could go on forever. I mentioned this to Paetec's engineers (I use the term very loosely) and you would have thought I was speaking Klingon.

Rcaman


Americom, Inc.
Where The Art And Science Of Communications Meet