I use these to (don't you all shoot me...) terminate station wire for small ACS systems. In the size of 16 to 20 stations and below. We punch the station wire down and use mod cords to jump from the mod plugs to the ACS station ports.

The reason I don't want to change is standardization. I have these in several locations but if the the manufacturer can keep the supply pipes full I may have to look at an alternative...in that case I would like one to be pre-assembled out of the box so the techs would not have to put it together which also keeps them standardized.

I used to have several of these laying around from deinstalls and phone room clean up jobs but I've used them all and they are backordered right now...bummer...