I don't know about Canadian codes, but here in the US, all wiring within the elevator machine room must be contained within EMT (conduit). While your responsibility to bring the circuit in usually ends at the elevator control panel, make sure that if conduit is required in your area that it is provided by others or factored into your price.


Ed Vaughn, MBSWWYPBX