|
|
Joined: Jul 2005
Posts: 1,184
Member
|
Member
Joined: Jul 2005
Posts: 1,184 |
We always put the EOL's in the panel on the fire alarms we install using the same method.
Dang, you guys are allowed to do that? It's against code here on fire panels. We aren't allowed to bury the EOL though so it is always on a labelled wall plate.
Another trick on DSC; if you don't have the 16VAC available for some reason but want to power the panel up and run it from the battery - just take a couple of jumper wires and feed the 12VDC battery into the AC input terminals (1&2, polarity doesn't matter) for a couple of seconds. The panel will now run on the battery input.
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
Forums84
Topics94,306
Posts638,894
Members49,771
|
Most Online5,661 May 23rd, 2018
|
|
2 members (phonman123, R4+Z),
72
guests, and
37
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|