Existing client has a tower site in the country, that's never had telco service. It was needed, so the telco buried 3000 feet of cable from the SLIC, along the road through the farmer's field and to the building.

Nice shiny new NID. I noticed there was no attempt to bond the NID to the building ground...the cable shield was attached to the ground terminal in the NID, but that's all.

Do you guys see this often?

I might give the guy a break because it's a thermobond building, and as it turns out, the main ground bar is at the far side of the building.

I went ahead and bonded it properly, because I didn't want to leave that hanging unbonded next to a 400' tall lightning rod.