I did think it strange that there are no labels on those cables.
-Hal The labels on on the front of that patch panel...that should be good enough, until...
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Jan 2005
Posts: 15,397 Likes: 18
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,397 Likes: 18 |
Is it a case of the cables having been terminated at this end, randomly? And then labelled at the far end? How could one possibly get them to look that good, and also be in the correct order? While I've never done a project nearly that large, my larger ones (typically 100-200 cables max.) were usually marked/taped together in sets of six cables as they were being pulled. This was pretty easy to do as the reels/boxes were set up in groups of six. Since the patch panels we were using had the blocks configured in groups of six, dressing it up wasn't too difficult to do. One guy that I worked with actually made us throw in one odd color per six cables as a 'racing stripe' so that our lacing skills could be quickly critiqued and redone. We also made it a point to keep the cable length to an absolute minimum, as in within a foot or two of termination. This saved a bunch of sorting time. Lastly, keeping them loosely bundled in groups of six with backward electrical tape made it easy to keep it as 'sortable' as possible when termination time came. After the cables left the room and into the closed ceiling spaces, it was anything goes. Yes, we even did stoop as low as not following any fixed location numbering order at the station end if it meant that the switch room looked perfect. As long as the jacks were properly labeled, nobody complained.
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: Feb 2009
Posts: 3,136
Moderator-Vodavi, Vertical, XBlue
|
Moderator-Vodavi, Vertical, XBlue
Joined: Feb 2009
Posts: 3,136 |
I concur with Ed on this one. To insist that the station ends be in sequential order would be virtually impossible to do when the patch panel is terminated so remarkably. I also suspect that this install required the use of a cable comb beginning somewhere prior to the observable cable rack.
- Dave S. -
You can never appease your ideologue opponents.
|
|
|
|
Joined: Sep 2018
Posts: 68
Member
|
Member
Joined: Sep 2018
Posts: 68 |
Nothing wrong with that as long as the numbers match up on both ends.
No matter the end, its satisfying to get your port number and find it in a decent office.
Aisle 1 rack 1, bay 1, port 24. 101.1.24 x 101.2.1.43? Yesss.
|
|
|