T1 punch to CPE - 12/09/08 07:55 AM
I have a question about extending a Bonded T1 past the Channel Bank.
Some boring background info:
We will be moving to a new building in January, so I have some time to get it all figured out.
Our phone service will consist of 5 POTS lines and a BONDED T1 line. In our case, 2 T1 Circuits.
I did an examination of the building already. It’s a 2 story multitenant building. We are on the second floor; with the ILEC Demarc on the first floor. There is already a channel bank in the demarc room, used by another tenant. We would be CKTs 2 and 3. The ILEC's policy is to save on equipment, so tenants share the T1 channel banks.
We have a 25 pair cable going between the demarc room and our suite. I spoke to the Verizon tech about what their wiring conventions are.
He said the obvious "we aren’t responsible past the Demarc", which wasn't my question.
I wanted to know what order/conventions were used for punching down the lines on 25 pair block to get them to the suite. And if we can use the 25 pair cable. for both POTS and T1's.
He went on to explain that it was perfectly fine to combine POTS and T1 service on the same 25 pair, since that is how their Out Side plant is wired. He then said that the POTS division would start by punching line 1 at the top White/blue, Blue/white pair and go down, on our block.
The T1 guys would start at the bottom with Violet/slate, slate/violet pair and work up.
My questions here are.
[*]Or am I looking to far into this, and just do what feels right because there are no conventions to this.</ol><font size="2" face="Verdana, Arial">
Where would I go to find this stuff with out having to have been a Verizon tech in the past?
This is in the surrounding Albany New York Area, that may or may not have been NYNEX in the past, if that helps
Thank you all for any insight you can give. It is much appreciated.
Some boring background info:
We will be moving to a new building in January, so I have some time to get it all figured out.
Our phone service will consist of 5 POTS lines and a BONDED T1 line. In our case, 2 T1 Circuits.
I did an examination of the building already. It’s a 2 story multitenant building. We are on the second floor; with the ILEC Demarc on the first floor. There is already a channel bank in the demarc room, used by another tenant. We would be CKTs 2 and 3. The ILEC's policy is to save on equipment, so tenants share the T1 channel banks.
We have a 25 pair cable going between the demarc room and our suite. I spoke to the Verizon tech about what their wiring conventions are.
He said the obvious "we aren’t responsible past the Demarc", which wasn't my question.
I wanted to know what order/conventions were used for punching down the lines on 25 pair block to get them to the suite. And if we can use the 25 pair cable. for both POTS and T1's.
He went on to explain that it was perfectly fine to combine POTS and T1 service on the same 25 pair, since that is how their Out Side plant is wired. He then said that the POTS division would start by punching line 1 at the top White/blue, Blue/white pair and go down, on our block.
The T1 guys would start at the bottom with Violet/slate, slate/violet pair and work up.
My questions here are.
- Has anyone seen this before?
- Is this common?
- By starting at the bottom, what would the pin out be</font><ol type="1">
- Transmit then receive OR
- Receive then Transmit.
- Would you skip pairs?
- Would you knowing that these are two circuits working together start with CKT 2 or CKT 3 from the bottom, or would it be the reverse of that.
[*]Or am I looking to far into this, and just do what feels right because there are no conventions to this.</ol><font size="2" face="Verdana, Arial">
Where would I go to find this stuff with out having to have been a Verizon tech in the past?
This is in the surrounding Albany New York Area, that may or may not have been NYNEX in the past, if that helps
Thank you all for any insight you can give. It is much appreciated.