Quote
Originally posted by Noisycow:
It works out to 1130' feet, with about 650' of that underground. The rest in running through their giant building to get to the data room. They are debating having the innerducts exposed in the inside runs vs running the 4" PVC all the way.
You are aware that the OSP cable must be terminated/transitioned within 50' of entering the building, correct?