Got a call last week to go out to a new oil battery field office and terminate the installed cables. They purchased an RTM. The prints shows each outlet to be two cables one for voice and one for data, there is only one cable in the outlets. They asked us to add a second cable. There is insulation between the floor joist and the bottom is double drywalled for fire rating. The outlets upstairs have a 3/4 pipe stub with the one cable in it. The data cables were installed at the factory, so they are between the fllor jiosts. My thoughts were to get one of those long flexable bits and try to drill down, find the hole make it bigger pull the cable up and then fire caulk. Anyone with a different idea? Thanks
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
Forums84
Topics94,287
Posts638,784
Members49,767
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
147
guests, and
174
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|