Again I'm not positive, but wasn't one for terminating and the other for bridging? We never used the distribution blocks, just the splicing blocks, after I got out of construction and into maintenance the Bell System changed to a smaller mini block, not sure if they were made by 3m or not. The last time I used the system shown in the video was probably the mid 70's or so, it was fast.


Retired phone dude