Quote
Originally posted by Alupis:
hmm... ok so say i need to move 5 offices to the other side of the building... correct steps for me to take would be:

1) Move all the stuff from one office to the other
2) Log into DB Studio (Programming? same thing???) and move the old and new extensions to blank temp holding extensions (to free up the extensions i want to use)
3) then flip the extensions so that they are now in the correct place for the office

i'm assuming thats what ill have to do each time ( which is what i've been doing). so i guess the phones wont loose programming or functions due to the move since those are hard coded into the phone?

so i guess there is no faster way to move phones than this juggling act of extensions lol... unless if i want to start moving wires on the PBX...