I had a similar response. I was turning up a fractional PRI with 11 channels. I was told the first 11 and D on 24. I built the circuit a week in advance. On cut day, same results. It turned out that the particular carrier likes to build their fracs from the bottom up. So basically the D was up, but no B channels assigned to the channels the carrier was looking for. **#@@?