|
|
Joined: Jun 2006
Posts: 126
Member
|
Member
Joined: Jun 2006
Posts: 126 |
After every P91-1, 91-9 and P03 you have to switch the system off for 20 seconds before powering it back up again. This is called Power Recycle.
The code is 21 for P03 for the PEKU card. And if you have a HDSS console, then the code would be 23 instead.
Check that switch for the port 007 in (any PEKU card) is not set to DSS but to EKT as well. And if all ports are still the same, try the second PEKU card.
And if there is no change in the problem........ Oh-oh.
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Apr 2005
Posts: 2,526 Likes: 4
Member
|
Member
Joined: Apr 2005
Posts: 2,526 Likes: 4 |
Alangraph,
Let us know what solution you used to correct this problem.
This is how we learn.
Dan S
We get old too soon, smart too late
|
|
|
Forums84
Topics94,520
Posts639,990
Members49,850
|
Most Online5,661 May 23rd, 2018
|
|
1 members (justbill),
239
guests, and
44
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|