web statisticsweb stats

Business Phone Systems

Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
#443926 11/02/06 03:53 PM
Joined: Jul 2005
Posts: 1,184
Member
Member
Offline
Joined: Jul 2005
Posts: 1,184
I use Panduit wiring duct from the ceiling down. Cabling looks neat but are not pin-striped and it makes additions easy.
https://www.panduit.com/search/sear...p;Ne=1&region=USA&Nu=P_RollupKey

Atcom VoIP Phones
VoIP Demo

Best VoIP Phones Canada


Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.

#443927 11/08/06 06:47 AM
Joined: Oct 2002
Posts: 597
Member
Member
Offline
Joined: Oct 2002
Posts: 597
On a BIG job I try to get all my racks and panels in place. As my crew pulls in cables I get them dressed and terminated as there pulled in. This is the preferred method for me! Turns out beautiful every time....

#443928 11/08/06 07:41 AM
Joined: Jan 2005
Posts: 15,397
Likes: 18
Moderator-Vertical, Vodavi, 1A2, Outside Wire
*****
Moderator-Vertical, Vodavi, 1A2, Outside Wire
*****
Joined: Jan 2005
Posts: 15,397
Likes: 18
I agree, but only in a perfect world. How is this possible when it's new construction and you have to pull the cable and wait for walls and finishes to be completed? Certainly you wouldn't be able to leave racks and patch panels exposed to paint overspray, theft, etc.

Your process for work in existing finished space is the way to go. It's so much easier to dress a handful of cables at a time than wrestling several hundred that are too long or tangled.


Ed Vaughn, MBSWWYPBX
#443929 11/08/06 10:02 AM
Joined: Dec 2005
Posts: 1,399
Member
Member
Joined: Dec 2005
Posts: 1,399
Speaking of racks and panels....
I lost a small cabling job a year or so ago to sparkie. :shrug:

Anyway, I stopped in as the building was being trimmed out and had to laugh...

The job itself was horrible, tie wraps pulled as tight as the "installer" could pull them, wads of cable tied as "service loops", etc.

Well they also had all of the jacks terminated and hanging out of the walls as well as the 7 foot aluminum rack and 24 port patch panel installed BEFORE the painter was done. The office was sprayed the most hideous baby butt yellow, and so was all of the jacks and the rack and the patch panels. The panel had so much over spray on it you couldn't read most of the port numbers!

Sometimes justice IS served!


_ _ _ _ _ _ _ __ _ _ _ _ _ _ _
#443930 11/10/06 10:34 AM
Joined: Sep 2006
Posts: 132
Member
Member
Offline
Joined: Sep 2006
Posts: 132
Always Comb the Rack make it pretty.

Remember its only a short distance compared to the whole cable run.

You will have Alien Crosstalk problems if you have long parallel straight runs in the field.

Page 3 of 3 1 2 3

Moderated by  Silversam 

Link Copied to Clipboard
Newest Topics
SV8100 beeping
by Jackcmann - 04/10/25 05:29 AM
Samsung xchange server
by scanjet - 04/07/25 06:37 PM
NEC IP Phones
by juno - 04/04/25 09:05 AM
NEC IP phones rebooting
by jpet621 - 04/03/25 03:03 PM
Forum Statistics
Forums84
Topics94,515
Posts639,965
Members49,848
Most Online5,661
May 23rd, 2018
Newest Members
Kevin usama, Pruitt roger, ActiveTelephones, yeloshak, ty3995
49,847 Registered Users
Top Posters(30 Days)
Toner 10
Taddeo 6
dexman 3
Who's Online Now
0 members (), 208 guests, and 26 robots.
Key: Admin, Global Mod, Mod
Contact Us | Sponsored by Atcom: One of the best VoIP Phone Canada Suppliers for your business telephone system!| Terms of Service

Sundance Communications is not affiliated with any of the above manufacturers. Sundance Phone System Forums - VOIP & Cloud Phone Help
©Copyright Sundance Communications 1998 - 2025
Powered by UBB.threads™ PHP Forum Software 8.0.0