web statisticsweb stats

Business Phone Systems

Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 4 1 2 3 4
#451785 02/17/09 01:39 PM
Joined: Feb 2009
Posts: 47
Member
Member
Offline
Joined: Feb 2009
Posts: 47
Okay, what's a BEP assembly?

And thanks Hal, no worries. smile


Complete noob.
Atcom VoIP Phones
VoIP Demo

Best VoIP Phones Canada


Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.

#451786 02/17/09 01:50 PM
Joined: Feb 2005
Posts: 12,354
Likes: 4
Member
***
Member
***
Offline
Joined: Feb 2005
Posts: 12,354
Likes: 4
Building Entrance Protector. The CPE (customer provided equipment) side would have a block with the pair count on it. One wire per clip, so that block would would handle 24 pair.

-Hal


CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
#451787 02/17/09 04:29 PM
Joined: Apr 2007
Posts: 894
Member
Member
Offline
Joined: Apr 2007
Posts: 894
Quote
Originally posted by MooreTel:
To be honest, I don't see the point of using a 66 block for such a simple installation setup. :shrug:
i know i would have used a small bix myself :p


Jay, a recovering IT guy
#451788 02/17/09 05:07 PM
Joined: Feb 2005
Posts: 12,354
Likes: 4
Member
***
Member
***
Offline
Joined: Feb 2005
Posts: 12,354
Likes: 4
Well, here\'s the block. Solves part of the mystery but don't ask me why it was done that way. Sounds like B and C was not designed for wiring, only bridge clips.

-Hal


CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
#451789 02/17/09 05:18 PM
Joined: Dec 2004
Posts: 1,106
Member
*
Member
*
Joined: Dec 2004
Posts: 1,106
Spend a couple bucks and get a NORMAL 66 Block! (66M1-50) That block your using would drive me nuts!


Trump 2020
Proud 1 star member.
#451790 02/17/09 05:18 PM
Joined: Jan 2005
Posts: 15,397
Likes: 18
Moderator-Vertical, Vodavi, 1A2, Outside Wire
*****
Moderator-Vertical, Vodavi, 1A2, Outside Wire
*****
Joined: Jan 2005
Posts: 15,397
Likes: 18
Wow, that block design makes absolutely no sense to me either. I can only assume that they were designed for some strange scenario where tip is on the left and ring is on the right as opposed to standard vertical block layouts. Perhaps a Canadian thing? :rofl:


By the way: Anybody interested in some of those 66E3-25 blocks? I'm sitting on about 200 of them and willing to make a deal.


Ed Vaughn, MBSWWYPBX
#451791 02/17/09 05:25 PM
Joined: Dec 2002
Posts: 9,429
Likes: 3
Member
*****
Member
*****
Joined: Dec 2002
Posts: 9,429
Likes: 3
Somehow I knew that block was Reltec/Marconi, but when I did a search, Marconi redirected to Ericsson. When did they sell to Emerson? Gotta love this biz!
Ed, PM sent


Jeff Moss

Moss Communications
Computer Repair-Networking-Cabling
MBSWWYPBX, JGAE
#451792 02/18/09 01:41 AM
Joined: Jul 2003
Posts: 1,136
Likes: 1
Member
Member
Joined: Jul 2003
Posts: 1,136
Likes: 1
I agree with 1864, get a block that you will likely see in the real world to learn with. Once you do that, what we are talking about will be clear.

BTW Ed, now I see why they use Bix

#451793 02/18/09 02:05 AM
Joined: Nov 2008
Posts: 65
Member
Member
Offline
Joined: Nov 2008
Posts: 65
</font><blockquote><font size="1" face="Verdana, Arial">quote:</font><hr /><font size="2" face="Verdana, Arial">Originally posted by EV607797:
[QB] Wow, that block design makes absolutely no sense to me either. I can only assume that they were designed for some strange scenario where tip is on the left and ring is on the right as opposed to standard vertical block layouts. Perhaps a Canadian thing? :toast:


--Matt
#451794 02/18/09 04:58 AM
Joined: Feb 2005
Posts: 12,354
Likes: 4
Member
***
Member
***
Offline
Joined: Feb 2005
Posts: 12,354
Likes: 4
Ed, the description says:

For 6-pair applications the network cable can be terminated on column A and customer
premise cable terminated on column D. The circuit is closed by installing either bridging
clips over or jumper wires between columns B and C. The bridge clip or jumper may
then be removed, disconnecting the circuit, for testing.


But why turn the clips around??

-Hal


CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
Page 3 of 4 1 2 3 4

Moderated by  Silversam 

Link Copied to Clipboard
Newest Topics
Samsung xchange server
by scanjet - 04/07/25 06:37 PM
NEC IP Phones
by juno - 04/04/25 09:05 AM
NEC IP phones rebooting
by jpet621 - 04/03/25 03:03 PM
SV9100 store hours mailbox
by muddybl - 04/03/25 02:10 PM
Forum Statistics
Forums84
Topics94,513
Posts639,938
Members49,844
Most Online5,661
May 23rd, 2018
Newest Members
yeloshak, ty3995, Sippy, sersmith, Taddeo
49,844 Registered Users
Top Posters(30 Days)
Toner 8
Taddeo 5
dexman 3
Who's Online Now
1 members (BobRobert), 173 guests, and 49 robots.
Key: Admin, Global Mod, Mod
Contact Us | Sponsored by Atcom: One of the best VoIP Phone Canada Suppliers for your business telephone system!| Terms of Service

Sundance Communications is not affiliated with any of the above manufacturers. Sundance Phone System Forums - VOIP & Cloud Phone Help
©Copyright Sundance Communications 1998 - 2025
Powered by UBB.threads™ PHP Forum Software 8.0.0