Unloaded is the only way to go using jacks and a quick termination tool...like the Jackrapid. The only exception to this for me is if I am filling up a 12 port or smaller panel...then the 66 mounted panel works fine.
www.myrandomviews "Old phone guys never die, they just get locked in some closet with an old phone system and forgotten about" Retired, taking photographs and hoping to fly one of my many kites.
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Mar 2004
Posts: 488
Member
|
Member
Joined: Mar 2004
Posts: 488 |
Thanks for everybodys input. It is nice to hear that we think alike on some things.
|
|
|
|
Joined: Jan 2007
Posts: 1,951 Likes: 2
RIP
|
RIP
Joined: Jan 2007
Posts: 1,951 Likes: 2 |
It must be that because I'm such an enormous fan of Leviton that I cannot cost-justify an unloaded patch panel.
Oh I agree that they're a cool, flexible, pay-as-you-go solution, but those individual keystones add up. Of course I can pass the cost along to the customer, but if we're talking about apples to apples COSTS (alone) of say a 48-port loaded versus unloaded, man I don't see how you can justify using the unloaded.
Perhaps it's that I'm just getting a nice deal on the loaded Leviton P/Ps, because I consider my keystone price to be pretty low (they are bought in large quantity).
"Press play and record at the same time" -- Tim Alberstein
|
|
|
|
Joined: Sep 2005
Posts: 9,289 Likes: 15
Admin
|
Admin
Joined: Sep 2005
Posts: 9,289 Likes: 15 |
Tim mount that loaded panel on a rack that has very little space behind it and terminate 5 cables to it. Leave it there with the CG for a couple months then go back to install another 15 cables. Now figure your labor time vs the cost of loaded or unloaded and see how they compare.
|
|
|
|
Joined: Dec 2004
Posts: 1,106
Member
|
Member
Joined: Dec 2004
Posts: 1,106 |
How 'bout when the IT dept. uses 1' patch cords to the switch on a Front accessible (hinged) loaded panel.. thank you very much! 
Trump 2020 Proud 1 star member.
|
|
|
Forums84
Topics94,516
Posts639,970
Members49,848
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
300
guests, and
30
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|