I'm helping a friend, a fellow contractor, wire an 8,000 sq ft house being renovated from the walls in.
The EC on the job got his panties in a knot because he thought he'd get all the low-v work, but my friend, who specializes in alarms, home audio, data networks, etc, got that part of the job.
As a consolation prize, the low-v contractor, the GC, the architect and the owner told Sparkie that he could have the work to trench-in the TV and telephone service from the street to the house, a distance of 400 feet, and the control cable from the house for the automatic gate, another 300 feet or so.
Sparkie then asked my friend what kind of wire to use. My friend told him, "You're the Master Electrician...I'm not going to tell you how to do your job."
From the TV / Tel pedestals, Sparkie buried a 1.000" schedule 40 PVC pipe, inside of which he pulled two Cat5e cables and an RG6.
Going the other direction towards the automatic gate, he buried a 1.500" schedule 40 PVC with one Cat5e and one 12-2 w/Ground UF, INSIDE THE SAME PIPE.
Tomorrow, on the advice of my friend and me, the GC will be having "an open and frank exchange of views" with Sparkie. I'm glad I'll be somewhere else when the cussin' and spittin' begins.
Arthur P. Bloom "30 years of faithful service...15 years on hold"
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Dec 2002
Posts: 9,429 Likes: 3
Member
|
Member
Joined: Dec 2002
Posts: 9,429 Likes: 3 |
It never ends. We had a new dimming system installed here at school and the electrician didn't understand why he had to keep the wires twisted for the control cable. It's digital data! His terminations were awful.
Jeff Moss Moss Communications Computer Repair-Networking-Cabling MBSWWYPBX, JGAE
|
|
|
|
Joined: Jan 2005
Posts: 15,401 Likes: 18
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,401 Likes: 18 |
Arthur, I don't know why your head didn't explode upon sight of that. I can't even begin to imagine how I would have reacted.
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: Dec 2007
Posts: 908
Member
|
Member
Joined: Dec 2007
Posts: 908 |
Well at least he told the "Master Elecrician" were to get off.
|
|
|
|
Joined: Sep 2006
Posts: 3,290
Member
|
Member
Joined: Sep 2006
Posts: 3,290 |
It's just amazing, I agree. When you see them install the proper sized conductors for the line voltage, but have no clue what they're doing when it comes to low-V, you have to wonder...
Arthur P. Bloom "30 years of faithful service...15 years on hold"
|
|
|
|
Joined: Dec 2002
Posts: 9,429 Likes: 3
Member
|
Member
Joined: Dec 2002
Posts: 9,429 Likes: 3 |
In our case, they renovated the auditorium. They took all the outlets and stuff out of the walls so they could put new acoustic panels on. This included the microphone plates which they just cut off. They were smart enough to know what they could not figure out how to reinstall them, so they paid me to do it. Funny thing, I'm sure that I would have had to redo them if they had tried to do it themselves. They did manage to screw up some of my stage lighting circuits too. It's only 3 wires, going to one receptacle. They came back a few times and finally made it right.
Jeff Moss Moss Communications Computer Repair-Networking-Cabling MBSWWYPBX, JGAE
|
|
|
|
Joined: Feb 2005
Posts: 12,356 Likes: 4
Member
|
Member
Joined: Feb 2005
Posts: 12,356 Likes: 4 |
Going the other direction towards the automatic gate, he buried a 1.500" schedule 40 PVC with one Cat5e and one 12-2 w/Ground UF, INSIDE THE SAME PIPE.
I wouldn't be too hard on him, he might have read what I have been teaching over on the electrical forums. Most likely though he had no idea and just did it that way. That actually is the correct way to run power and LV in the same conduit.
The thing to remember is that the CAT5 cannot be in the same box with the STRIPPED conductors of he UF unless you provide a partition in the box. Normally you would just have both the cables coming out of the conduit and put some duct seal on the ends if outside. Then run the exposed UF into a box and the CAT5 to wherever.
-Hal
CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
|
|
|
|
Joined: Feb 2005
Posts: 12,356 Likes: 4
Member
|
Member
Joined: Feb 2005
Posts: 12,356 Likes: 4 |
See my post #8 in this thread. -Hal
CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
|
|
|
|
Joined: Nov 2008
Posts: 627
Member
|
Member
Joined: Nov 2008
Posts: 627 |
The question is more important than the answer.
|
|
|
|
Joined: Feb 2005
Posts: 12,356 Likes: 4
Member
|
Member
Joined: Feb 2005
Posts: 12,356 Likes: 4 |
From the TV / Tel pedestals, Sparkie buried a 1.000" schedule 40 PVC pipe, inside of which he pulled two Cat5e cables and an RG6.
Oh yeah. I missed that jem! Even RG-11 ain't gonna cut it at 400 feet. Should be flooded .500. Then of course we come to that &*%$@ friggin CAT5 crap! Should be 6 pair BSW. And this all means a hell of a lot bigger conduit.
-Hal
CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
|
|
|
Forums84
Topics94,525
Posts640,013
Members49,852
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
166
guests, and
44
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|