|
Joined: May 2002
Posts: 17,742 Likes: 32
Member
|
Member
Joined: May 2002
Posts: 17,742 Likes: 32 |
Wasn't as tough as I thought it would be, yes pressure dams.
Retired phone dude
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Sep 2006
Posts: 3,290
Member
|
Member
Joined: Sep 2006
Posts: 3,290 |
I believe that the NEC rules do not apply to utilities on their on property.
Yes, they are air dams, or plugs. They are created either at the factory or in the field (not a pleasant task).
Arthur P. Bloom "30 years of faithful service...15 years on hold"
|
|
|
|
Joined: Jul 2003
Posts: 766
Member
|
Member
Joined: Jul 2003
Posts: 766 |
Thanks for the responses. Another contractor pulled it in. There's conduit to get to the other side of the room for it but they just ran the perimeter of the room. It's not secure terminated on a 66-block when all the previous cables are on 110 blocks for organization and space. In general just crap work. I'm pushing them to get it rerouted and terminate.
Thanks again,
Last edited by SST; 02/13/16 05:14 PM.
|
|
|
|
Joined: Jul 2003
Posts: 766
Member
|
Member
Joined: Jul 2003
Posts: 766 |
It's all the icky-pic accumulating and getting ready to explode  !
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
I believe that the NEC rules do not apply to utilities on their on property. Exactly so. NY Tel used to do some of their own electrical work (mostly receptacles to racks) and it was a disaster. Nobody licensed, nothing filed, NOTHING to code. A fire waiting to happen. Sam
Last edited by Silversam; 02/13/16 06:07 PM.
"Where are we going and why are we in this hand basket?"
|
|
|
|
Joined: Sep 2006
Posts: 3,290
Member
|
Member
Joined: Sep 2006
Posts: 3,290 |
On the other hand, I worked for a while in a gang that installed line voltage circuits in CO's in Manhattan, and we were very meticulous about doing picture-perfect work. Our foreman appreciated the fact that neat and code-compliant work required sufficient time to perform. His favorite expression was "When it's finished, it should look like it grew there."
Last edited by Arthur P. Bloom; 02/13/16 06:48 PM.
Arthur P. Bloom "30 years of faithful service...15 years on hold"
|
|
|
|
Joined: Feb 2005
Posts: 12,354 Likes: 4
Member
|
Member
Joined: Feb 2005
Posts: 12,354 Likes: 4 |
Where is the protection? Any time I ever saw something like that the OSP cables were spliced to stubs going to BEP terminals. From there there was a wall full of 66 blocks to cross connect to the building risers. Not directly spliced like that.
-Hal
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
On the other hand, I worked for a while in a gang that installed line voltage circuits in CO's in Manhattan, and we were very meticulous about doing picture-perfect work. Our foreman appreciated the fact that neat and code-compliant work required sufficient time to perform. His favorite expression was "When it's finished, it should look like it grew there." The way it should be. Sam
"Where are we going and why are we in this hand basket?"
|
|
|
|
Joined: May 2002
Posts: 17,742 Likes: 32
Member
|
Member
Joined: May 2002
Posts: 17,742 Likes: 32 |
Where is the protection? Any time I ever saw something like that the OSP cables were spliced to stubs going to BEP terminals. From there there was a wall full of 66 blocks to cross connect to the building risers. Not directly spliced like that.
-Hal Hal, when we did large jobs that require this we used CO protection and fuses to terminate the stubs. Look exactly like a CO frame.
Retired phone dude
|
|
|
|
Joined: Feb 2006
Posts: 1,716
Member
|
Member
Joined: Feb 2006
Posts: 1,716 |
LOL...if you guys want a good laugh, just come to Pittsburgh and check out how Bell Telephone used PE cable to run to any floor in a building. Some buildings have thousands of feet of it in ceilings, wiring closets and walls. It was the "soup du jour" of the techs tasked with delivering circuits to the tall buildings in the city.
Our COs, however, were pristine. The electrical work was all done by Local 5 electricians and the CO wiring was perfect. In the early 60s, Bell Telephone made several instructional movies to show other BOCs how to do it correctly. Of course, now...things have changed.
Rcaman
Americom, Inc. Where The Art And Science Of Communications Meet
|
|
|
Forums84
Topics94,491
Posts639,864
Members49,836
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
239
guests, and
242
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|