I have a customer who wants to replace (4) Separate fibers runs with 50 Micron OM3
(2) of the runs are from building to building with conduit (1) building has a piece of inner duct inside a 4 inch conduit with a exiting fiber in there already my question is this
should I or can I try to send a snake in the inner duct and pull a piece of new fiber in the inner duct I was thinking indoor/outdoor or should I try to pull a piece of outdoor armored just in the conduit there looks like theres plenty of room The inner duct looks like its a 1.25 wide
I know I could probably use the exiting piece of fiber for a pull but I would prefer to leave that in place to prevent any down time
it is a school and the work will be done in summer
The other run is just a 4 inch conduit which I pulled the exiting cable a while back
so I was just going to use the outside Armored for that
Any Thoughts would be greatly appreciated
Thanks!!
|
|
|