I am beginning my 1A2 install using an ITT 601 KSU equipped with 5 lines using 400E KTUs and a combined intercom.

I'm laying out the 66 blocks and mushrooms and would welcome advice on properly mounting everything. My plan is to run 25 pair from the KSU to a 66B block which is next to the KSU. I will cross connect from there to the adjoining 66M blocks.

At the top right of this picture is a Cat5 block so I can bring in two C*Net lines from my cable modem/router and a connection to Xlink which supports bluetooth to my cell.

I was planning to use the biscuits below the 66B to connect the CO lines into either the KSU or 66B.

Thanks for taking the time to look. I have greatly enjoyed looking through the archives.

I have a ground wire ready to go as well.

[Linked Image]


Jim Churchill

C*NET 1-821-9771