Just started on a new site in Michigan and was setting my rings above the grid. I was told by the electrician that the code had change and that even in a non air return ceiling plenum cable was required. Iam still waiting for a call back from the inspector and I was wondering if anyone else had heard this
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: May 2002
Posts: 17,747 Likes: 38
Member
|
Member
Joined: May 2002
Posts: 17,747 Likes: 38 |
Have him show you in the code. Never heard of it.
Retired phone dude
|
|
|
|
Joined: Feb 2008
Posts: 316
Member
|
Member
Joined: Feb 2008
Posts: 316 |
I would check the spec's to see what the customer was asking for. I would also check with the electrical engineer who designed the job. Not sure what your codes are up there. It could be your electrician just pulling your leg.
|
|
|
|
Joined: Jan 2005
Posts: 15,409 Likes: 18
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,409 Likes: 18 |
I have seen that before, but it was due to a local ordinance in one county in Maryland. It's been quite a while and I really doubt that it is still being enforced. There are some instances in health care facilities where plenum low-smoke cable is required.
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: May 2002
Posts: 17,747 Likes: 38
Member
|
Member
Joined: May 2002
Posts: 17,747 Likes: 38 |
I can't find anything in the NEC about it, wording hasn't changed.
If it is a local code I'd still have to see it to believe it.
Retired phone dude
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
If it is the case, it's a local code. When I worked at the World Trade Center, The Port Authority of NY & NJ (the AHJ) spec'd plenum for everything, including inside pipe & floor ducts.
Sam
"Where are we going and why are we in this hand basket?"
|
|
|
|
Joined: Dec 2007
Posts: 2,033
Moderator-Toshiba
|
Moderator-Toshiba
Joined: Dec 2007
Posts: 2,033 |
We get it for any job in Westerville, Ohio. Always plenum, no matter what. I myself have never seen the code in writing, as my boss is the one that always pulls the permits... but since this came up, I will ask him if he ever has. I know that the electric company there is municipally owned and operated, if that has any effect on it.
- Tony Ohio Data LLC Phone systems, data networks, firewalls and servers in Central Ohio. Some people aren't used to an environment where excellence is expected.
|
|
|
|
Joined: Feb 2005
Posts: 12,360 Likes: 4
Member
|
Member
Joined: Feb 2005
Posts: 12,360 Likes: 4 |
Yeah, it is a local ammendment. You won't find it in the NEC.
I'm pretty much with Tony- any cable we stock is plenum. But if you have a large data job that requires CAT5 and you can use riser it pays not to use plenum. That's also one reason we use CAT3 for voice, unlike CAT5 or 6 there is little difference in cost between riser and plenum so for voice it's always plenum.
-Hal
CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
|
|
|
|
Joined: Dec 2002
Posts: 9,429 Likes: 3
Member
|
Member
Joined: Dec 2002
Posts: 9,429 Likes: 3 |
It is the same deal in Cleveland. I use plenum for everything. The University of Toledo also requires all voice/data cabling to be plenum.
Jeff Moss Moss Communications Computer Repair-Networking-Cabling MBSWWYPBX, JGAE
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
I was the foreman when we rewired Lenox Hill Hospital here in NYC. New CO, battery plant, key equipment, risers, station wiring, sets. About 3,000 stations. A square city block plus in Manhattan.
The job was bid for all plenum wiring. When I looked over the complex I found there was one room that required plenum wiring.
The savings were huge. On a smaller job they would have been comparatively smaller and if you're a small shop I can see where it might not pay to store two types of cable. But certainly look if you've got a big cable job.
Sam
"Where are we going and why are we in this hand basket?"
|
|
|
Forums84
Topics94,556
Posts640,128
Members49,862
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
61
guests, and
85
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|