I am trying to find info on local code for Richmond VA about what the requirement is for pulling cable in a Hospital EVEN if it is not plenum ceiling!
Any one have any info???
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Jan 2005
Posts: 15,397 Likes: 18
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,397 Likes: 18 |
Richmond has some very strange requirements and yes, I've been forced to use plenum cable even in non-plenum environments. I think that a big part of the problem is that the chief electrical inspector there used to be the city's fire marshal. They are very strict and there isn't much getting around them.
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: Jul 2007
Posts: 388
Member
|
Member
Joined: Jul 2007
Posts: 388 |
I'd make the call to see what they require. Here despite what the elec inspector says most of the work has to be inspected by the fire dept and yeah they often require things above and beyond the NEC. I have taken to just using plenum in anything commercial.
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
We had a similar situation in NYC with the WTC. The AHJ there was the Port Authority; they required all communication cable to be in pipe (end-to-end) AND to be plenum.
Whatever the AHJ wants.
Sam
"Where are we going and why are we in this hand basket?"
|
|
|
|
Joined: Jun 2001
Posts: 10,949
Moderator-Avaya
|
Moderator-Avaya
Joined: Jun 2001
Posts: 10,949 |
Originally posted by Silversam: We had a similar situation in NYC with the WTC. The AHJ there was the Port Authority; they required all communication cable to be in pipe (end-to-end) AND to be plenum.
Whatever the AHJ wants.
Sam The University of Kentucky campus is the same way Sam.
Avaya SMB Authorized Business Partner. ACIS/APSS ESI Certified Reseller/Installer www.regal-comm.com
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
Mike -
Nice to know they're crazy everywhere. But at least their craziness creates more work - and not less - like I see so much of these days.
Sam
"Where are we going and why are we in this hand basket?"
|
|
|
|
Joined: Jun 2001
Posts: 10,949
Moderator-Avaya
|
Moderator-Avaya
Joined: Jun 2001
Posts: 10,949 |
It was the dangest thing I ever saw. 4inch e.m.t. trunks with 24 x 24 pull boxes every 75ft and could not have more than a 260 degree bend between pull boxes.
Avaya SMB Authorized Business Partner. ACIS/APSS ESI Certified Reseller/Installer www.regal-comm.com
|
|
|
|
Joined: May 2007
Posts: 5,059 Likes: 6
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,059 Likes: 6 |
I wish every job was like that - as long as they're willing to pay for it.
Years ago I wired Fordham University. A Nightmare. They wanted every cable concealed. If it couldn't be concealed it had to be in wiremold.
We put in 16,000' of wiremold on the job. Some of the buildings were 150 years old.
A Nightmare.
4" with PBs every 75' sounds like a dream.
Sam
"Where are we going and why are we in this hand basket?"
|
|
|
|
Joined: Jul 2003
Posts: 6,768
Member
|
Member
Joined: Jul 2003
Posts: 6,768 |
Richmond has some very strange requirements and yes, I've been forced to use plenum cable even in non-plenum environments.
Same here, I have had to do this in Charlottesville Virginia when a Richmond firm was in control of the building!
|
|
|
|
Joined: Jul 2007
Posts: 388
Member
|
Member
Joined: Jul 2007
Posts: 388 |
Years ago we did a job on a reservation school where everything was piped. It was somewhere near 1500 drops. The building was all precast with no interior class rooms. Classrooms were nothing more than office furniture walls. It was two weeks of running conduit before we even started pulling lines.
|
|
|