Kyawa,

I think this is starting at a server or main frame location like a server room and then feeding three separate buildings if I read and understand this correctly. Therefore, this job will require three runs of outdoor 6 or 12 strand fiber, one to each location and all terminating in the server room or main frame.

If building "A" is where the server room is, then you would be correct in that only two runs would be required.

Rcaman