Originally posted by 5Etek-mike: ....ANSI/TIA/EIA-942 [Telecommunications Infrastructure Standard for Data Centers]
Here's the copy and pasted reference:
Hot and Cold Aisles ...Cold aisles are in front of racks and cabinets. ...Hot aisles are behind racks and cabinets. ...A minimum of 1 m (3 ft) of front clearance shall be provided ...1.2 m (4 ft) is preferable ...A minimum of 0.6 m (2 ft) of rear clearance... :rofl:
Telecommunications Installation and Repair: April 1, 1966 -- November 30, 2011
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Dec 2002
Posts: 9,429 Likes: 3
Member
|
Member
Joined: Dec 2002
Posts: 9,429 Likes: 3 |
Well I guess they better start installing some fiber 
Jeff Moss Moss Communications Computer Repair-Networking-Cabling MBSWWYPBX, JGAE
|
|
|
|
Joined: Dec 2006
Posts: 1,516
Member
|
Member
Joined: Dec 2006
Posts: 1,516 |
Just admit it, you were simply thinking ahead for the IT guy! :toothy: Take some "before" pics while it's still difficult to recognize the area as a call center. It sounds like a tremendous install!
|
|
|
|
Joined: Jun 2005
Posts: 261
Member
|
Member
Joined: Jun 2005
Posts: 261 |
The first floor is just a single rack, 120 floor positions, 96 LAN ports, in a 100+ square foot room. Wow.. sounds like fun.. Imagine 120 people and 96 computers in 100 square feet.. :rofl: I imagine you intended to say "100+ foot square" BTW Mike.. I love reading your blog..
|
|
|
|
Joined: Jan 2006
Posts: 176
Member
|
Member
Joined: Jan 2006
Posts: 176 |
The current call center is at 33.8359,-118.3112 ; the new place is at 33.8394,-118.3109 .
I'm taking pictures, but my card reader died and I've misplaced my camera-usb cable.
The 100 square feet is refering to the terminal room, not the whole floor. As you can see by plugging the above numbers into maps.google.com it's a decent sized building. We have 3/4 of the first floor, all of the second, and none of the third.
The IT guy is (1) an old friend and (2) someone I like owning me a favor.
Blogging is fun. It is also a handy notepad. For instance, I can search for "Douglas" and find the June 11th '07 entry where I note where under the floor I left my three available quads.
Telecommunications Installation and Repair: April 1, 1966 -- November 30, 2011
|
|
|
Forums84
Topics94,518
Posts639,976
Members49,850
|
Most Online5,661 May 23rd, 2018
|
|
2 members (Toner, Telesystems),
180
guests, and
52
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|