I've got a pretty large install coming up next month replacing an old Rolm system at a large resort.
Planning on taking lots of pictures and wanted to know if I can post my progress here?
Thanks
D
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: May 2002
Posts: 17,713 Likes: 11
Member
|
Member
Joined: May 2002
Posts: 17,713 Likes: 11 |
Sure. We could even pin it for you until the project is complete.
Retired phone dude
|
|
|
|
Joined: Apr 2005
Posts: 2,490 Likes: 1
Member
|
Member
Joined: Apr 2005
Posts: 2,490 Likes: 1 |
800 phone install, that sounds like fun.
Enjoy doghart
Rolm was a great system until IBM bought them out, boy did they screw up a good thing up!!
We get old too soon, smart too late
|
|
|
|
Joined: Jul 2001
Posts: 1,985
Moderator-Mitel, NEC, Vodavi
|
Moderator-Mitel, NEC, Vodavi
Joined: Jul 2001
Posts: 1,985 |
Sip phones? or NEC IP phones?
|
|
|
|
Joined: Apr 2007
Posts: 1,439
Member
|
OP
Member
Joined: Apr 2007
Posts: 1,439 |
No Voip, customer didn't want it internally, don't blame them.
About 150 Dterm phones and 650 analog stations. 3 PRI's to start, then going to implement 72 SIP trunks later.
OW5000 with UA5200 and MC550.
Should be fairly straightforward (I hope). PMS integration always throws me for a loop, but the staff on site really have it together so hoping for a smooth cutover.
D
Last edited by doghart; 01/31/14 04:05 AM.
|
|
|
|
Joined: Sep 2005
Posts: 971
Member
|
Member
Joined: Sep 2005
Posts: 971 |
Thanks for Info Doghart. This will be a interesting event no doubt. I will be following your quest.
-TJ-
|
|
|
|
Joined: Jul 2005
Posts: 1,333
Member
|
Member
Joined: Jul 2005
Posts: 1,333 |
Fun building up that MDF..
Regards,
Paul W Now back to a 0 day week. Love these 7 day weekends.
|
|
|
|
Joined: Apr 2007
Posts: 1,439
Member
|
OP
Member
Joined: Apr 2007
Posts: 1,439 |
Alrighty, let the games begin.... On the test bench, mini PC for call accounting on top of unit 02: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140116_151910_zps8b286ee7.jpg) The Rolm/Seimens PBX and the original cross connect field: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140210_120935_zps4482eca7.jpg) I was able to slide the Siemens over and get my 4 post rack into place. We also installed additional ladder rack for the 34 new tail cables coming out of the SV8300: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140210_120941_zpsa57bbfe4.jpg) Getting the hardware mounted in the rack. SV8300, 3 full units and UCE Server as well as some misc equipt (Call Accounting PC, MOH etc...): ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140210_134610_zpsd276c795.jpg) Alternate View: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140210_134616_zpsfdc048cf.jpg) Installed Wire Managment between the chassis of the 8300 for all those tail cables: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140210_135139_zpsd96955b2.jpg) Beginning of tail cable placement: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140211_091948_zps2d9e13b3.jpg)
|
|
|
|
Joined: Apr 2007
Posts: 1,439
Member
|
OP
Member
Joined: Apr 2007
Posts: 1,439 |
Have to make some room for 18 new 66 blocks: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140212_123818_zpsd51cd692.jpg) Rack looking fairly clean but not 100% done yet: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140212_123833_zpsb0047fff.jpg) New tails (white) routed behind the exisitng tails we pulled away from the backboard: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140212_123902_zpse26012d2.jpg) Another view: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140212_123907_zps40a5b6cd.jpg) And another: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140212_123921_zpscc5345be.jpg) Took a break from taking pictures to install 780 phones and 6200 feet of cross connect. We used green Xconnect to keep track of old jumpers vs. new.: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140219_1514471_zpsbe978e29.jpg) Another view: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140219_151454_zps7ac9812e.jpg) Another: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140219_151501_zps3c14b98b.jpg) Front of PBX Rack now complete: ![[Linked Image from i8.photobucket.com]](https://i8.photobucket.com/albums/a14/Doghart/Cheyenne%20Mtn/20140219_151530_zps34db43bc.jpg) And that's the story of how I spent the last 2 weeks. D
|
|
|
|
Joined: Jun 2004
Posts: 1,367
Member
|
Member
Joined: Jun 2004
Posts: 1,367 |
Very nicely done.
How long did the data collection take?
|
|
|